Integrating what and for whom? Financialisation and the Thames Tideway Tunnel

By: Contributor(s): Material type: ArticleArticlePublication details: Sage, 2019.Description: Vol 56, Issue 11, 2019,( 2280-2296 p.)Subject(s): Online resources: In: Urban studiesSummary: The Thames Tideway Tunnel (TTT), often referred to as the Thames super sewer, is currently one of the largest infrastructure projects underway in any European city. Costing an estimated £4.2 billion, the sewer connects London’s Victorian sewerage network with the Thames Wastewater Treatment Works at Beckton. The latter facility has been described as the UK’s Water–Energy–Food nexus poster child, for its combination of desalination facilities, green energy generation and wastewater treatment. While physically connected to the Beckton plant, the TTT is, paradoxically, designed with an apparent disregard for the water–energy nexus. If the Beckton plant represents a nexus-based vision of integration – what Macrorie and Marvin (2016) refer to as Mode 2 Urban Integration – the TTT harks back to a view of urban integration carried from the Victorian era through to the present moment. What unites the two projects, and what undergirds the transformation of the hydrosocial cycle, is a financial model more focused on the extraction of rents from Thames Water’s consumers. Thames Water’s dismissal of genuinely integrated alternatives appears guided more by the financialisation of the urban integrated ideal than by what is needed to respond to London’s broader environmental needs. Contesting the project, therefore, will involve slicing through the various claims to integration, going beyond the many proposals for evidence-based alternatives, and capturing the transformations being wrought by finance’s entry into infrastructure provision.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Vol info Status
E-Journal E-Journal Library, SPAB Vol. 56, Issue 1-16, 2019 Available
Total holds: 0

The Thames Tideway Tunnel (TTT), often referred to as the Thames super sewer, is currently one of the largest infrastructure projects underway in any European city. Costing an estimated £4.2 billion, the sewer connects London’s Victorian sewerage network with the Thames Wastewater Treatment Works at Beckton. The latter facility has been described as the UK’s Water–Energy–Food nexus poster child, for its combination of desalination facilities, green energy generation and wastewater treatment. While physically connected to the Beckton plant, the TTT is, paradoxically, designed with an apparent disregard for the water–energy nexus. If the Beckton plant represents a nexus-based vision of integration – what Macrorie and Marvin (2016) refer to as Mode 2 Urban Integration – the TTT harks back to a view of urban integration carried from the Victorian era through to the present moment. What unites the two projects, and what undergirds the transformation of the hydrosocial cycle, is a financial model more focused on the extraction of rents from Thames Water’s consumers. Thames Water’s dismissal of genuinely integrated alternatives appears guided more by the financialisation of the urban integrated ideal than by what is needed to respond to London’s broader environmental needs. Contesting the project, therefore, will involve slicing through the various claims to integration, going beyond the many proposals for evidence-based alternatives, and capturing the transformations being wrought by finance’s entry into infrastructure provision.

There are no comments on this title.

to post a comment.
Share

Library, SPA Bhopal, Neelbad Road, Bhauri, Bhopal By-pass, Bhopal - 462 030 (India)
Ph No.: +91 - 755 - 2526805 | E-mail: library@spabhopal.ac.in

OPAC best viewed in Mozilla Browser in 1366X768 Resolution.
Free counter