300 _axii,279p.
505 _a1.Introduction and background of value engineering -- 2.Habits , roadblocks and attitude -- 3.The value engineering job plan-- 4.Function analysis-- 5.Crative thinking-- 6.Managing the value engineering study-- 7.Cost modeling-- 8.LIfe-cycle costing-- 9.Energy-- 10.Value engineering case study NO. 1 wastwater treatment plant -- 11.Value engineering case study No. 2 wastewater treatment plant -- 12.Value engineering case study No. 3. Engineering management building -- 13- hour ve workshop seminars.. 10.Value engi
650 _aConstruction industry-cost control